Drillhole data to resource estimates,
on your laptop.

Validate drillhole data, run EDA, and build resource estimates โ€” all in one tool. Used by mining professionals and academic projects. Works offline. Your data stays with you.

Free ยท no credit card Works offline Pros & academics

Need all 3 phases? See bundle (Rp 99K) โ†’

Built around how geologists actually work

Workflows from real exploration projects. Aligned with SNI 4726:2019, KCMI 2017, and JORC 2012 reference standards. Used by mining professionals and academic resource estimation projects.

๐Ÿ”’

Your data stays with you

No uploads. No cloud. No telemetry. Drag a CSV, get insights. Works fully offline.

โšก

First chart in 5 minutes

No install. No setup. No environment to configure. Open and start working.

๐Ÿ“‹

Output aligned with KCMI & JORC

Reporting templates built around KCMI 2017 and JORC 2012. Output tables and PDF metadata match what Competent Persons and auditors review.

Three modules. One complete workflow.

From raw drillhole data to a report-ready resource. Pick one phase or get the full set.

Phase 01 Drillhole Prep
PHASE 01 FREE

Drillhole Prep

Validate collar, survey, and assay tables before they cause problems downstream. Automated desurvey, cross-table checks, export-ready strip logs.

12 tabs ยท raw to clean in ~5 min
Get free
Phase 02 Drilling EDA
PHASE 02 In bundle

Drilling EDA

Statistics, correlations, top-cut, ANOVA by lithology. Reveal patterns spreadsheets won't show. Composites ready for estimation.

12 tabs ยท spacing โ†’ domain โ†’ composite
Get the bundle โ†“
Phase 03 Resource Estimation
PHASE 03 In bundle

Resource Estimation

Variogram modeling, block model, IDW and ordinary kriging, M/I/I classification, grade-tonnage curves. Export a KCMI-ready report.

12 tabs ยท variogram โ†’ kriging โ†’ report
Get the bundle โ†“

A quick tour through each phase

From drillhole data to resource estimation โ€” the full three-phase workflow in one video.

2:16 ยท all three phases ยท no audio

What the outputs look like

Real screens. Production data, not mockups.

Phase 01 strip log
PHASE 01

Multi-track strip logs

Lithology, weathering, multi-element grade curves, sample sticks.

Phase 02 correlation matrix
PHASE 02

Multi-element correlation

Pearson heatmap and scatter matrix to find element associations.

Phase 03 grade-tonnage
PHASE 03

Grade-tonnage curves

Cumulative tonnage and average grade vs cutoff โ€” ready for resource statement.

Try Phase 1 โ€” Free

Or unlock all 3 phases โ†’ See bundle

SEE THE DIFFERENCE Orebit vs commercial workstations vs Excel โŒ„

A quick look at how Orebit fits the early-to-mid stage workflow.

โ† swipe to see all columns โ†’
Commercial 3D suite Excel + scripts Orebit
Drillhole validation Yes Manual / error-prone Automated cross-checks
Variography & kriging Yes Limited Spherical / Exponential / Gaussian
JORC / KCMI report Yes Manual write-up Auto-generated PDF
Install Heavy desktop install Spreadsheet + macros None โ€” open the file
Learning curve Weeks of training Custom per spreadsheet Built-in tutorial per stage
Data privacy Local files Local files Local only ยท zero uploads
Best for Production & auditor sign-off Ad-hoc analysis Early-to-mid stage exploration
Cost USD 15โ€“30K / year Low Free P1 ยท Bundle Rp 99K one-time

Orebit doesn't replace commercial 3D mining software for production reporting โ€” it covers the workflow that comes before, fast and offline.

Free entry. Pay once for the full workflow.

Phase 1 is free forever. Pay once for the bundle to unlock EDA and Resource Estimation. No subscription. Yours to keep forever.

Lead magnet

Phase 1 โ€” Drillhole Prep

Start here. Free download, lifetime use.

Rp 49K FREE
No credit card. Email required.
  • Validate collar, survey, assay tables
  • Works offline ยท no install required
  • Sample drillhole dataset included
  • Output: HOLEID, FROM, TO, X, Y, Z (universal CSV format)
Get free
๐ŸŽ“

For geology students

Complete final-year resource estimation workflow. Built-in tutorial. Sample drillhole data. PDF reports aligned with KCMI 2017.

โ›๏ธ

For mining professionals

Universal CSV output (HOLEID, FROM, TO, X, Y, Z) compatible with commercial 3D mining software. 70% faster data validation. Local-only privacy.

Need a team or site license? Contact us โ†’

Common questions, straight answers

No. Orebit covers the workflow from raw drillholes to a report-ready estimate with full transparency. Commercial software is still needed for complex 3D implicit modeling, structural geology, and auditor sign-off. Orebit fits early-to-mid stage exploration, fast validation work, and small teams that can't justify a USD 30K/year license.

Yes. Output tables (assay validation, per-domain statistics, variogram parameters, M/I/I classification, grade-tonnage curves) align with KCMI 2017 Table 1. The auto-generated PDF carries the metadata auditors expect. Always cross-check with your Competent Person before final reporting.

Completely. Everything runs locally on your laptop โ€” no server, no uploads, no external connections after download. Verify it yourself: disconnect from the internet, open the tool, everything keeps working. A full privacy audit log is in the docs.

CSV with comma or semicolon delimiters, dot or comma decimals. Indonesian Excel exports work out of the box. Column templates follow industry conventions for collar, survey, assay, and geology tables (Hole_ID, Depth_From, Depth_To, and so on).

Email hello@orebit.id. No ticket queue, no support bot โ€” you reach the developer directly. Replies typically arrive within one or two business days.

Lean development with no enterprise sales overhead. Each module is a single self-contained tool โ€” no servers to run, no licenses to enforce, no per-seat pricing. The savings go to the geologists using it, especially small teams and remote sites without budget for USD 30K licenses.

Phase 1 ยท FREE
No credit card ยท works offline
Try free โ†’Try โ†’